| MWC UNIT # |
POLLUTANT OR PARAMETER |
START DATE |
TIME OF EXCESS EMISSIONS |
MONITORED LEVEL |
APPLICABLE LIMIT |
SPECIFIC REASON FOR EXCESS |
CORRECTIVE ACTIONS TAKEN |
| 2 |
CO |
9/18/2007 |
0400 |
0759 |
139 |
69 |
SHUTDOWN: leak developed in the superheater section of the unit due to the Turbine Generator being isolated from the power grid. Only 1 hour affected during the 4 hour block |
Removed MSW from grates as soon as possible to limit emissions. |
| 2 |
CO |
5/7/2007 |
2000 |
2359 |
194 |
69 |
SHUTDOWN: to repair tube leak (note that this excess emission was identified during the preparation of year-end reports). |
Removed MSW from grates as soon as possible to limit emissions. |