| MWC UNIT # |
POLLUTANT OR PARAMETER |
START DATE |
TIME OF EXCESS EMISSIONS |
MONITORED LEVEL |
APPLICABLE LIMIT |
SPECIFIC REASON FOR EXCESS |
CORRECTIVE ACTIONS TAKEN |
| 1 |
CO |
1/4/2005 |
16:00 |
19:59 |
80.9 |
69 |
shutdown unit for replacement of Forced Draft Fan pillow bearing |
installed new pillow bearing to Forced Draft Fan |
| 1 |
CO |
2/10/2005 |
12:00 |
15:59 |
735.3 |
69 |
Shutdown unit to verify repairs to Unit 2. Note: Turbine Generator was off line for overhaul. 4-hour average based on only 2 hours of operations |
Used gas burners to control emissions |
| 2 |
CO |
2/10/2005 |
16:00 |
19:59 |
107 |
69 |
Startup Unit 2 was returning to service after annual repair |
Used Gas burners to control emissions during startup |
| 1 |
CO |
4/15/2005 |
12:00 |
15:59 |
609.3 |
69 |
Shutdown due to a tube leak in the Economizer Note: 4-hour average based on only 1 hour of data |
Was able to maintain normal level in steam drum and bring unit off line in a controlled manner |
| 1 |
CO |
4/24/2005 |
16:00 |
19:59 |
180.8 |
69 |
Shutdown due to a tube leak in the Economizer Note: Data based on 1 hour of operation |
Was able to maintain normal level in steam drum and bring unit off line in a controlled manner |
| 2 |
CO |
5/16/2005 |
20:00 |
23:59 |
114.7 |
69 |
Shutdown-scheduled downtime for inspection and repairs of the unit Note: 4-hour average based on only 1 hour of operation |
used gas to bring the unit down to help control emission |